Connect with us

Energy

Beacon Power closes $2.7M seed round to boost electricity in Sub-Saharan Africa

Published

on

An energy tech company providing data and grid management solutions to help Africa’s power sector distribute electricity more efficiently, Beacon Power Services (BPS), has announced the closing of a $2.7 million round of seed financing on Friday.

The round was led by Seedstars Africa Ventures with participation from Persistent Energy, Factor[e], Kepple Africa Ventures, and Oridun Capital Management.

Nigerian NewsDirect reports that the funding will allow the company to enhance its product offerings, support growth in its current operations and expand beyond Nigeria and Ghana.

In a statement made available to Nigerian NewsDirect, Managing Partner at Seedstars Africa Ventures, Maxime Bouan, said “As a society, we have recognized climate change as one of the biggest threats to our generation, and it is critical we use smart capital to support entrepreneurs across Africa who are creating innovative and localized solutions to tackle this challenge.”

According to the Founder & Chief Executive Officer of BPS, Bimbola Adisa, “The BPS team has demonstrated success in partnering with Africa’s power companies to deploy data driven solutions that are relevant to their specific operating conditions.

“We recognize the significant economic, social and environmental impact of this technology that innovatively solves affordable electricity access. We are excited about the potential to support the team’s expansion to continue to disrupt power access and reliability across the continent.

“Africa is home to the fastest growing cities in the world, but when most people think of energy access in Africa, they think of the rural areas with little or no access to electricity at all. However, it is impossible for Africa to develop without significantly improving electricity access and reliability across its major cities,” Adisa noted.

Adisa added: “When we realized that solutions designed for mature markets fail to address the unique infrastructure challenges Africa faces, we developed a tailored solution for power companies on the continent to improve daily grid supply of electricity.

“We have helped our utility clients reduce network losses significantly, recover unrealised revenue and improve electricity reliability for over 30 million consumers and businesses. Most importantly, our technology is having a real impact on sustainable economic development and climate change in Africa by reducing the continent’s reliance on diesel generators.”

Continue Reading
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Energy

Over 500mmscf/d gas supply projects to be commissioned — Presidency

Published

on

The Presidency has disclosed plans to commission over 500mmscf/d gas supply projects across the country.

This is in line with the country’s move to transition from fossil fuels to gas according to its Decade of Gas initiative.

In a press statement on Friday, the spokesperson to the President, Ajuri Ngelale outlined three projects the President is billed to commission.

The statement reads: “In line with his commitment to significantly leverage gas to grow the economy, President Bola Tinubu will commission three critical gas infrastructure projects being undertaken by the Nigerian National Petroleum Company Limited (NNPCL) and partners.

“The projects support the federal government’s effort to grow value from the nation’s gas assets while eliminating gas flaring.

“The delivery of the projects was accelerated from the inception of the administration in keeping with the overall objective of deepening domestic gas supply as a critical enabler for economic prosperity.

“The projects lined up for commissioning include: (1) AHL Gas Processing Plant 2 (GPP – 2) – 200mmscf/d. This project is an expansion to the Kwale Gas Processing Plant (GPP – 1), which currently supplies about 130MMscf/d of gas to the domestic market. The processing plant is designed to process 200MMscf/d of rich gas and deliver lean gas through the OB3 Gas Pipeline. This additional gas supply will support further rapid industrialization of Nigeria. ”The plant will also produce about 160,000 MTPA of Propane and 100,000 MTPA of Butane, which will reduce the dependency on LPG Imports. The AHL Gas Plant is being developed by AHL Limited, an incorporated Joint Venture owned by NNPC Limited and SEEPCO.”

“(2) ANOH Gas Processing Plant (AGPC) – 300MMscf/d. The ANOH gas plant is an integrated 300MMscf/d capacity gas processing plant designed to process non-associated gas from the Assa North-Ohaji South field in Imo State. The plant will produce dry gas, condensate, and LPG. The gas from ANOH gas plant will significantly increase domestic gas supply, leading to increased power generation and accelerated industrialisation. The ANOH Gas Plant is being developed by ANOH Gas Processing Company, an incorporated Joint Venture owned by NNPC Limited and Seplat Energy Plc on a 50-50 basis.

“(3)ANOH-OB3 CTMS Gas Pipeline Project. The project involves the engineering, procurement, and construction of 36”x23.3km ANOH-OB3 Project. The Transmission Gas Pipeline will evacuate dry gas from the Assa North-Ohaji South (ANOH) primary treatment facility (PTF) to OB3 Custody Transfer Metering Station (CTMS) for delivery into the OB3 pipeline system. About 600MMscf/d is estimated to be available from two separate 2 x 300MMscf/d capacity gas processing production trains from AGPC & SPDC JV.”

“When commissioned, the projects will increase gas supply to the domestic market by approximately 500mmscf/d, creating a better investment climate and promoting balanced economic growth cumulatively.”

Continue Reading

Energy

Shell signs agreement to build gas pipelines in Oyo State

Published

on

Shell Nigeria Gas, SNG, and the Oyo State Government have signed an agreement to develop a gas supply and distribution infrastructure that will deliver gas to industrial and commercial users in the state.

A statement released on Friday by Shell Nigeria’s Media Relations Manager, Abimbola Essien-Nelson, disclosed that SNG will build and operate the gas distribution network, which will serve customers across Oyo State for 20 years.

According to the statement, the project will start with the construction of gas distribution infrastructure along a 15km pipeline route, adding that it will grow to deliver up to 60 million standard cubic feet of gas per day across the state.

Speaking at the signing ceremony, the Oyo State Governor Seyi Makinde, described the project as a catalyst for development in the state.

The Managing Director of SNG, Ralph Gbobo, noted that the agreement was “a significant milestone for SNG and Oyo State to boost economic activities in Nigeria by supplying industries and manufacturers with natural gas, a more reliable, cost-efficient and environmentally friendly source of energy.”.

He explained that the project would boost Oyo State’s internal revenue and create Job opportunities for indigenes.“

“The Managing Director of The Shell Petroleum Development Company of Nigeria Limited and Chairman, Shell Companies in Nigeria, Osagie Okunbor, remarked that the event pointed to the value of partnership as “Shell continues to power progress” in Nigeria through more and cleaner energy solutions for commercial and industrial customers.

Continue Reading

Energy

Nigeria ripe for nuclear power to boost electricity generation – NAEC 

Published

on

The Nigeria Atomic Energy Commission (NAEC) in collaboration with Centre for Energy Research and Training (CERT), Ahmadu Bello University (ABU), Zaria would deploy nuclear science and technology to strengthen electric power generation in Nigeria.

Prof. Yusuf-Aminu Ahmed, Chairman NAEC disclosed this during the 20th Anniversary Symposium of the Nigeria’s first Nuclear Research Reactor-1 (NNR-1) in Zaria on Thursday.

Ahmed said the experience developed over the years on nuclear power at the centre makes Nigeria ripe and ready to go into the next level of power generation through the nuclear reactor.

“We have used the reactor for research and development over the years and now we are going to use the reactor for the purpose of generating electricity.

“President Bola Tinubu has already given the commission a mandate to see how it contributes in the clean energy sphere of Nigeria and the nuclear energy programme of Nigeria would participate,’’ Ahmed said.

He explained that the time for the project would not be open for the public; however, Ahmed added that international partners and vendors were working closely with the commission over the project.

He also said that intergovernmental agreements were signed with some of the vendors on the nuclear power in Nigeria and very soon President Tinubu would make an announcement on the issue.

Earlier, Sen. George Akume, Secretary to the Government of the Federation said the 20 years of safe operation of the nuclear research reactor was an indication that Nigeria has joined the campaign for safe application of nuclear energy.

Akume, represented by his Special Assistant on Technical Issues, Prof. Bolaji Babatunde, added that since the centre had safely operated the nuclear research reactor for 20 years, it can also obtain a nuclear reactor for electricity generation.

According to him, the process of having a reactor that would generate electricity is similar to operating a nuclear research reactor.

“President Tinubu has re-echoed the need for having nuclear energy into the sources of electric power generation in Nigeria and Nigerians should look forward to this power.

“Electricity generated through nuclear energy is clean and safe except for human errors or natural causes such as the one that happened in Hiroshima,’’ he said.

Earlier, Prof. Sunday Jonah, Director of the center said the event was to celebrate 20 years of safe operation, maintenance and utilisation of the first Nuclear Research Reactor code named NNR-1.

However, in spite of the numerous gains at the centre over the years, the Director lamented over a plot by NAEC to wrestle the centre from the university through the proposed NAEC Bill 2022.

He explained that such a move would negate the dreams of the founding fathers that established the centre in universities because of the culture of research and development being promoted at designated universities.

Continue Reading

Trending